To make the whole project process easier for you we have outlined important information you should keep in mind.

Always review proposal to make sure all information is correct.

Purchasing material
  • Client has the responsibility of choosing slabs of their choice whether fabricator will be paying them or the client themselves.
  • The slabs need to be checked to see if they have any cracks.
  • Once slabs are approved and chosen by client, fabricator will not take responsibility for any cracks or natural characteristics that are unwanted.
  • Natural features of slabs cannot be altered!
Templating
  • Cabinets must be installed in order to do templates.
  • Cabinets must be cleared; plywood must be installed before templates can be done.
  • Plywood must be at least 5/8" minimum to 1/2" of thickness.
  • Sinks and cook tops must be provided to fabricator at day of templating.
Layout
  • Client is responsible to do the layout once templating has been done.
  • Client is responsible to see all the natural characteristics such as color, pattern, texture and size in slab.
  • Layout of slab is a final decision made by client or whomever they have designated to do the layout, therefore, once layout has been done there is NO way back.
  • Please have in mind that when slab is cut 25% of the slab becomes waste.
Turnaround Period
  • Two week turnaround period from day of layout.