
|
Process
To make the whole project process easier for you we
have outlined important information you should keep in mind.
Always review proposal to make sure all information
is correct.
Purchasing material
- Client has the responsibility of choosing slabs of their
choice whether fabricator will be paying them or the client
themselves.
- The slabs need to be checked to see if they have any
cracks.
- Once slabs are approved and chosen by client, fabricator
will not take responsibility for any cracks or natural
characteristics that are unwanted.
- Natural features of slabs cannot be altered!
Templating
- Cabinets must be installed in order to do templates.
- Cabinets must be cleared; plywood must be installed
before templates can be done.
- Plywood must be at least 5/8" minimum to 1/2" of thickness.
- Sinks and cook tops must be provided to fabricator at
day of templating.
Layout
- Client is responsible to do the layout once templating
has been done.
- Client is responsible to see all the natural characteristics
such as color, pattern, texture and size in slab.
- Layout of slab is a final decision made by client or
whomever they have designated to do the layout, therefore,
once layout has been done there is NO
way back.
- Please have in mind that when slab is cut 25% of the
slab becomes waste.
Turnaround Period
- Two week turnaround period from day of layout.
|
|
|